GXED owns the Grade A qualification certificate for industrial and civil architecture projects. Besides the civil work projects in hydropower, thermal power and substation projects, civil work department is taking an active role in the field of civil architecture. In its history of more than 40 years, GXED has completed design for civil architecture projects with an area of more than 200,000m2, which is featured with unique style and rich national appeal. Since 1978, GXED has won 7 medals of provincial and ministerial levels for its excellent design both in industrial and civil architecture projects.
The Electric Power Testing & Dispatching Center of Yulin Electric Power Supply Bureau, which is 71m of height with a floorage of 16428m2
Multi - purpose office building of GXED with 19 floors and a floorage of 12760m2. It won the Second Prize in Guangxi for High Quality Project.
Central control room in Heshan power plant with an installed capacity of 2×300MW