Fuel or gas-fired power plant investigation design achievements
No. Name of project Finished time Installed capacity
1 Liuzhou LNG power plant (liquefied natural gas) finished primary feasibility research 2x350MW
2 Nanning LNG power plant (liquefied natural gas) finished primary feasibility research 2x350MW
3 Maanshan steel company new developed area energy source comprehensive utilization power plant(CCTP)(mixed gas) under the construction design 1x135MW+150MW£¨CCPP£©
4 Shenzhen yueliangwan gas turbine power plant(fuel oil) 2001 1x36.6 MW +1x 15.5 MW
5 Liuzhou gas turbine power plant(fuel oil) 1998 1 x 25 MW+12MW
6 Shenzhen Dapeng gas turbine power plant(fuel oil) 1996

2 x 22.9 MW + 1 x 25 MW

7 Nanning gas turbine power plant(fuel oil) 1990 36.6 MW + 15.5 MW