| No. |
Name of project |
Finished time |
Installed capacity |
| 1 |
Liuzhou LNG power plant (liquefied natural gas) |
finished primary feasibility research |
2x350MW |
| 2 |
Nanning LNG power plant (liquefied natural gas) |
finished primary feasibility research |
2x350MW |
| 3 |
Maanshan steel company new developed area energy source comprehensive utilization power plant(CCTP)(mixed gas) |
under the construction design |
1x135MW+150MW£¨CCPP£© |
| 4 |
Shenzhen yueliangwan gas turbine power plant(fuel oil) |
2001 |
1x36.6 MW +1x 15.5 MW |
| 5 |
Liuzhou gas turbine power plant(fuel oil) |
1998 |
1 x 25 MW+12MW |
| 6 |
Shenzhen Dapeng gas turbine power plant(fuel oil) |
1996 |
2 x 22.9 MW + 1 x 25 MW |
| 7 |
Nanning gas turbine power plant(fuel oil) |
1990 |
36.6 MW + 15.5 MW |